Build & Quality Assurance
Consistency Is Built — Not Assumed
Even the best shaft will fail if it’s poorly assembled. Our build and QA process exists to remove variables before you ever step onto the range or into the field.
BARE vs BUILT — What’s the Difference?
| BARE |
BUILT |
|
|
The Build Process
Steps:
-
Shaft inspection
-
Squaring and preparation
-
Insert / half-out alignment
-
Adhesion and cure
-
Spin testing
-
Weight verification
Our Quality Checks
-
Visual inspection
-
Spin test for wobble
-
Component alignment check
-
Pack verification
Note (important):
We do not claim perfection — we claim consistency and accountability.
Build Turnaround
Built orders are processed within our stated 5 day build window. This ensures quality is not rushed and standards are maintained.